Design and Construction
Client: Various
Location: NSW, SA
Year: 2007
Leed have undertaken the design and construction of a number of precast concrete, post tensioned tanks in both metropolitan and remote locations.
The precast tanks offer advantages over traditional steel or insitu tank construction due to:
- Cost
- Ease and speed of construction
- Durability over steel tanks
- Panels can be manufactured off or on-site
- Panels can be manufactured whilst earthworks and base slab is being prepared
- Minimum personnel required for construction
Construction consists of earthworks preparation, the pouring of a post tensioned floor slab, manufacture and installation of wall panels, construction of stitch joints between the wall panels, post tensioning of the tank walls then construction of the steel roof and installation of associated pipework.
16ML Water Tank Kilmore, NSW
4ML Trillians Hill Tank SA Water - Clare, SA
4ML Albury Reservoir Tank Albury Water - Albury, NSW
2.6ML Reclaim Water Tank Mawson Lakes, SA